This project took over one year to complete. The pictures say It all.
This Is one long driveway It over 600 feet. The color or BISCAY TAN COLOR HARDNER on the main body,band on the edge are stamped w/COCO BROWN COLOR HARDNER.

PROJECT LOCATION CLOVIS,CA. The drive way has 5' scored joints on center with a 24" stamped band out side edges.